Transport allowance
Central Germany: €14,000 per truck, excluding VAT. One or two POPUP 28 homes use one truck; POPUP 52 uses one truck per home; POPUP 104 uses two trucks per home (€28,000). Select your destination country, city and delivery region. Outside central Germany, transport is recalculated and confirmed in the written offer. The displayed allowance remains subject to destination, site access, permits, escorts and final carrier confirmation.
Assembly is a separate planning allowance of €2,000 / €3,000 / €4,000 per POP-UP 28 / 52 / 104 home. Crane hire is excluded and arranged locally.
VAT and extras
Destination standard VAT is selected automatically where a verified rate is provided. This is a planning allowance, not a determination of the applicable housing, import or regional tax treatment. Customs duties and special transaction rules remain outside the calculation. Unknown transport or VAT is displayed as pending rather than zero.
Terrace allowances: €3,000 / €6,000 / €6,000 per POP-UP 28 / 52 / 104. Exterior blinds: €1,500 / €2,000 / €2,500. These supplied PDF amounts are treated as net planning allowances per home. Other selected items require a separate quote. The PDFs contain separate Germany package prices including transport and assembly; this configurator uses the selected factory-price-plus-logistics basis and does not add freight to those PDF package prices.
What the building price covers
The standard supply brief includes a finished envelope, internal wall finish, flooring, insulated roof, fitted bathroom, windows, lighting and internal electrical / plumbing installations. Final materials, dimensions, measured area, specifications and any energy upgrades are confirmed in the written offer. A base home is not necessarily ready for occupation until local connections and approvals are complete.
Additional costs to plan
- Land and land acquisition costs
- Survey, soil report and local design / permit fees
- Excavation, drainage, foundations and groundworks
- Utility connections, meters and external infrastructure
- Route-specific escorts, abnormal-load permits or access adaptations
- Customs brokerage, duties and tax adjustments where applicable
- Optional equipment and local energy-performance upgrades
- Landscaping and occupancy / commissioning requirements outside the agreed supply scope
Currency
EUR is the offer currency. USD displays use the ECB reference rate dated 2026-10-15: €1 = $1.1208. They are indicative EU-price conversions, not US-market offers, and do not include US shipping, taxes or compliance costs. Rates are not a live exchange quote.
Timing, certification and warranty
From deposit to delivery: 90 days, subject to the confirmed specification, production slot and site readiness. Applicable certification scope, warranty and final delivery programme are agreed in writing. Project approvals are local. The 3–4 storey system is quoted on request; panel projects require at least 500 m² at one location.